Handoff Acceptance Checklist
Owner: Anchor MSP Operations Lead Last reviewed: 2026-04-04
Purpose
Use this checklist when a development team (EGI or Mast) hands a system off to Anchor for managed production. Every item must be verified and signed off before Anchor accepts ownership.
Checklist
- Acceptance criteria met. All items from the Managed Production Acceptance Criteria are satisfied.
- Monitoring configured and producing data. Uptime Kuma checks are live. Prometheus is scraping metrics. Grafana dashboards are set up.
- Alerts routing to correct Slack channels. Alertmanager rules are configured. Test alerts have been fired and confirmed in
#alerts-critical,#alerts-high,#alerts-medium,#alerts-low. - Critical alert SMS escalation verified. A test critical alert has triggered SMS delivery via Twilio to the on-call operator.
- Backups configured and first backup completed. Restic jobs are running. First backup has completed successfully. Backup metrics are reporting to Prometheus.
- Secrets migrated to Vault. All secrets listed during acceptance criteria are stored in Vault. Application is configured to read secrets from Vault at runtime.
- Access provisioned for Anchor operators. Anchor team has the access needed to operate, monitor, and troubleshoot the system.
- Runbook created and reviewed. A system runbook exists using the Runbook Template. It has been reviewed by an Anchor operator.
- Escalation contacts confirmed. Development team has provided contacts for application-level escalation (name, role, Slack handle, phone).
- Development team acknowledges handoff complete. The development team confirms they understand Anchor now owns production operations for this system.
After Completion
Once all items are checked, the system is officially under Anchor management. The handoff date is recorded and the system's runbook becomes the operational reference.